Project’s Detail

DESKRIPSI TUGAS AKHIR :
RANCANG BANGUN SUPPORT TOOL REMOVE KING PIN INCLINATION PADA UNIT SCANIA P420 CB8X4EHZ
Abstrak (Abstracts)
This aims of this research are to design, make and use tools for the process of removing king pins. Generally this work is still done manually which raises the risk of damaging other components, namely, damaging the thread from the top cover of the king pin. It is quite draining a lot of energy due to repeated beatings and also in terms of safety is also less safe. This work takes 105 minutes. Based on the existing problems the researcher designed a tool to remove the king pin on the SCANIA P420 CB8X4EHZ unit by using the method of direct research conducted at the on job training at PT. United Tractors Tbk. Sanga Sanga site. Making this tool begins with the design using autocad and then making and testing are carried out in the workshop of PT. United Tractors site Sanga Sanga. The test results of the design of support tools to help remove the king pin on the SCANIA P420 CB8X4EHZ unit in terms of working time are 72 minutes faster, the risk of damaging other components is reduced, not much energy is wasted and safety is also safer. Penelitian ini bertujuan untuk merancang, membuat dan menggunakan alat bantu untuk proses pelepasan king pin. Umumnya perkerjaan ini masih dilakukan secara manual yang menimbulkan resiko merusak komponen lain yaitu, merusak ulir dari penutup atas king pin, cukup menguras banyak tenaga karena pemukulan yang berulang ulang dan juga dari segi safety juga kurang aman. perkerjaan ini membutuhkan waktu selama 105 menit. Berdasarkan permasalahan yang ada penulis merancang sebuah alat bantu untuk melepas king pin pada unit SCANIA P420 CB8X4EHZ dengan menggunakan metode penelitian secara langsung yang dilakukan pada saat pelatihan kerja di PT. United Tractors Tbk. site Sanga Sanga. Pembuatan alat ini diawali dengan perancangan menggunakan autocad dan pembuatan serta pengujiannya dilakukan di workshop PT. United Tractors site Sanga sanga. Hasil pengujian dari rancang bangun support tool untuk membantu melepas king pin pada unit SCANIA P420 CB8X4EHZ dari segi waktu pekerjaan menjadi lebih cepat 72 menit, resiko merusak komponen lain berkurang, tidak banyak tenaga terbuang dan segi safety juga menjadi lebih aman.

Keyword : Building design, Safety, Support tool, king pin inclination, SCANIA P420 CB8X4EHZ.

Nilai Properti
: MUHAMMAD ALI MASHUDI, : 912017038, : Politeknik Negeri Balikpapan, : ALAT BERAT, : 2020, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Zulkifli, S.T., M.T.

E-mail :zulkifli@poltekba.ac.id

www.poltekba.ac.id
Dr. Hadi Hermansyah, S.Si., M.Si.

E-mail :hadi.hermansyah@poltekba.ac.id

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://karanganbungacilacap.com/selotgacorku/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/