Project’s Detail

DESKRIPSI TUGAS AKHIR :
Estimasi Anggaran Biaya dan Penjadwalan Proyek Pengembangan Hotel Sepinggan Balikpapan
Abstrak (Abstracts)
In the implementation oh construction project development, of course there are several planners in it, some of which are planning of budgeting and scheduling. If the two plans can be planned properly then the construction project will be effective and efficient. This final project aims to find out how much the estimated cost incurred and the time needed to complete the Sepinggan Hotel Development project, Balikpapan. The supporting data in the preparation of the budged plan uses the 2020 material price list in Balikpapan City, as well as the coefficient standart based on PUPR in 2016. For the scheduler using network planning through the critical path method. The result of calculations that been carried out, the Sepinggan Hotel Development Poject, Balikpapan can be estimate at Rp 32.270.659.000,00.. and completion time using network planning through the critical path method for 625 days with a working time of 1 day for 7 hours. Pelaksanaan pembangunan proyek konstruksi tentunya terdapat beberapa perencana yang ada di dalamnya, beberapa dari perencanaan itu ialah menyusun rencana anggaran biaya dan penjadwalan. Jika kedua perencanaan itu dapat direncanakan dengan baik maka jalannya proyek konstruksi akan menjadi efektif dan efisien. Tugas akhir ini bertujuan untuk mengetahui berapa estimasi biaya yang dikeluarkan serta waktu yang dibutuhkan untuk menyelesaikan proyek pengembangan Hotel Sepinggan Balikpapan. Adapun data pendukung dalam penyusunan rencana anggaran biaya menggunakan daftar harga material kota Balikpapan tahun 2020, serta standar koefisiennya berdasarkan PUPR tahun 2016. Untuk penjadwalannya menggunakan metode jaringan kerja melalui jalur kritis. Dari hasil perhitungan yang telah dilakukan, proyek pengembangan Hotel Sepinggan Balikpapan dapat diestimasikan biaya yang dikeluarkan sebesar Rp 32.270.659.000,00. dan waktu penyelesaian menggunakan metode jaringan kerja melalui jalur kritis selama 625 hari, dengan waktu kerja 1 hari salama 7 jam.

Keyword : Budged Plan, Scheduling, Network Planning

Nilai Properti
: NALA PERMANA SANTOSA, : 922018010, : Politeknik Negeri Balikpapan, : TEKNIK SIPIL, : 2021, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Mahfud, S.Pd., M.T.

E-mail :mahfud@poltekba.ac.id

www.poltekba.ac.id
Fatmawati, S.T., M.T.

E-mail :

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://karanganbungacilacap.com/selotgacorku/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/