Project’s Detail

DESKRIPSI TUGAS AKHIR :
PENYUSUNAN RAB DAN PENJADWALAN PEMBANGUNAN RUKO 3 LANTAI DI KOTA BALIKPAPAN
Abstrak (Abstracts)
ABSTRACT Planning time and a good budget plan is indispensable in the implementation of the project so the control can be easily done to ensure that the implementation of the project has been in the set can be achieved with the least deviation and results satisfactory by utilizing existing resources. Budget plan costs is the calculation of the costs required for materials and wages, as well as the indirect costs associated with implementation. In the absence of a budget plan costs, quite possibly due to the cost of purchase of the swelling of building materials that are not in accordance with the volume of work, wage work uncontrolled There are many methods to make the planning and scheduling of projects, one of which is the Critical Path Method (CPM) or critical path method in which this method on-site series of main activity components with a total amount of time the longest and showed the completion of the project is called the critical path. Based on the analysis of the results obtained in this project cost plan implementation Rp 712.8 million (seven hundred and twelve million eight hundred thousand Rupiah) with a time of execution of the construction project for the next 125 Days Keywords:, CPM, scheduling, cost, timing, method ABSTRACT Planning time and a good budget plan is indispensable in the implementation of the project so the control can be easily done to ensure that the implementation of the project has been in the set can be achieved with the least deviation and results satisfactory by utilizing existing resources. Budget plan costs is the calculation of the costs required for materials and wages, as well as the indirect costs associated with implementation. In the absence of a budget plan costs, quite possibly due to the cost of purchase of the swelling of building materials that are not in accordance with the volume of work, wage work uncontrolled There are many methods to make the planning and scheduling of projects, one of which is the Critical Path Method (CPM) or critical path method in which this method on-site series of main activity components with a total amount of time the longest and showed the completion of the project is called the critical path. Based on the analysis of the results obtained in this project cost plan implementation Rp 712.8 million (seven hundred and twelve million eight hundred thousand Rupiah) with a time of execution of the construction project for the next 125 Days Keywords:, CPM, scheduling, cost, timing, method ABSTRACT Planning time and a good budget plan is indispensable in the implementation of the project so the control can be easily done to ensure that the implementation of the project has been in the set can be achieved with the least deviation and results satisfactory by utilizing existing resources. Budget plan costs is the calculation of the costs required for materials and wages, as well as the indirect costs associated with implementation. In the absence of a budget plan costs, quite possibly due to the cost of purchase of the swelling of building materials that are not in accordance with the volume of work, wage work uncontrolled There are many methods to make the planning and scheduling of projects, one of which is the Critical Path Method (CPM) or critical path method in which this method on-site series of main activity components with a total amount of time the longest and showed the completion of the project is called the critical path. Based on the analysis of the results obtained in this project cost plan implementation Rp 712.8 million (seven hundred and twelve million eight hundred thousand Rupiah) with a time of execution of the construction project for the next 125 Days Keywords:, CPM, scheduling, cost, timing, method ABSTRAK Perencanaan waktu dan biaya yang baik sangat diperlukan dalam pelaksanaan proyek sehingga pengendalian dapat dengan mudah dilakukan untuk memastikan bahwa pelaksanaan proyek telah di tetapkan dapat dicapai dengan penyimpangan paling minimal dan hasil memuaskan dengan memanfaatkan sumber daya yang ada. Rencana anggaran biaya merupakan perhitungan biaya yang diperlukan untuk bahan dan upah, serta biaya-biaya tidak langsung yang berhubungan dengan pelaksanaan.Tanpa adanya rencana anggaran biaya , sangat mungkin terjadi pembengkakan biaya dikarenakan pembelian bahan bangunan yang tidak sesuai dengan volume pekerjaan, upah kerja yang tidak terkontrol Terdapat banyak metode untuk membuat perencanaan dan penjadwalan proyek, salah satunya adalah Critical Path Method (CPM) atau metode jalur kritis di mana metode ini meiliki rangkaian komponen-komponen kegiatan utama dengan total jumlah waktu terlama dan menunjukan kurun waktu penyelesaian proyek disebut jalur kritis. Berdasarkan hasil analisa diperoleh rencana biaya pelaksanan proyek ini sebesar Rp. 712.800.000 (Tujuh Ratus Dua Belas Juta Delapan Ratus Ribu Rupiah) dengan waktu pelaksanaan pembangunan proyek selama 125 Hari Kata kunci: CPM, penjadwalan, metode, waktu, biaya

Keyword : CPM, scheduling, cost, timing, method

Nilai Properti
: MIFTAH FARID , : 150309270792, : Politeknik Negeri Balikpapan, : TEKNIK SIPIL, : 2018, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Mahfud, S.Pd., M.T.

E-mail :mahfud@poltekba.ac.id

www.poltekba.ac.id
Drs. Sunarno, M.Eng.

E-mail :sunarno@poltekba.ac.id

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://vclass.unila.ac.id/blog/sdana/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/