Project’s Detail

DESKRIPSI TUGAS AKHIR :
RENCANA ANGGARAN BIYA (RAB) DAN PENJADWALAN PEMBANGUNAN RUKO 3 LANTAI DI JALAN PROJKAL BALIKPAPAN UATARA
Abstrak (Abstracts)
IN PROGRESS TO BUILD A BUILDING, COST ESTIMATION PLAN (RAB) AND PROJECT SCHEDULING IS ONE OF THE IMPORTANT ASPECT TO BE CONSIDEREND. IN THIS CONSTRUCTION PROJECT COS ESTIMATION PLANT (RAB) HAVE A BIG ROLE, BECAUSE IT CAN ORGANIZE THE BUGET AND MEASURE THE WORK PRODUCTIVITY. THE FUNCTION OF PROJECT SCHEDULING OF ARE TO GET A LAYOUT ABOUT POTENCIAL ABBILTY OF A PROJECT, ANALYSIS PROJECT COST, ALLOCATION OF HUMAN RESOURCH AND MATERIAL EFECTIVELY AND EFICIENTLY AND ALSO CAN LIMIT THE PROJECT PROCESSING SO IT WILL NOT RUN OUT OF TIME BUILD A CONSTRUCTION TAKES SEVERAL MEASURES TO CALCULATE BUDGET , AMONG OTHERS, DRAWING CONSTRUCTION PLANS, REGULATIONS AND REQUIREMENTS , ANALYSIS OF COST AND SOME OTHER CONDITIONS. PLANNING COSTS ARE INFLUENCED BY THE PRICE ESCALATION OF MATERIALS, LABOR, LOCATION OF WORK AND CONDITIONS OF EMPLOYMENT. STANDARDIZATION OF PRICES FOR LABOR AND MATERIALS USED DATA OBTAINED FROM THE PUBLIC WORKS DEPARTMENT, THE ANALYSIS AND MATERIAL PRICES SNI 2018 BALIKPAPAN CITY. THE RESULT OF THIS PROJECT FOR 3 FLOOR SHOPHOUSE FOR AHSP DPU BALIKPAPAN CITY IS RP 6,458,051,000.00 IT HAS AN OUTPUT THE WORK OF SCHEDULLE IN 44 WEEKS OR 11 MONTHS BY USING THE KURVA S METHODE. DALAM PENDIRIAN SEBUAH BANGUNAN, RENCANA ANGGARAN BIAYA (RAB) DAN PENJADWALAN PROYEK MERUPAKAN SALAH SATU ASPEK PENTING YANG HARUS DIPERHATIKAN. RENCANA ANGGARAN BIAYA SANGAT BERPERAN BESAR DALAM PEKERJAAN KONSTRUKSI, KARENA DAPAT MENGATUR PEMBIAYAAN DAN MENGUKUR PRODUKTIVITAS KERJA. FUNGSI DARI PENJADWALAN PROYEK ADA BEBERAPA HAL ANTARA LAIN MEMPEROLEH GAMBARAN MENGENAI KEMAMPUAN POTENSIAL DARI SUATU PROYEK, MENGANALISA BIAYA PROYEK, MENGALOKASIKAN SUMBER DAYA MANUSIA DAN MATERIAL SECARA EFEKTIF DAN EFISIEN SERTA MENGATUR BATAS PENGERJAAN PROYEK AGAR TIDAK MELEBIHI WAKTU YANG DITENTUKAN. MEMBANGUN SUATU KONSTRUKSI DIBUTUHKAN BEBERAPA SYARAT UNTUK MENGHITUNG ANGGARAN BIAYA, ANTARA LAIN GAMBAR RENCANA KONSTRUKSI, PERATURAN DAN SYARAT-SYARAT, ANALISA PERHITUNGAN BIAYA DAN BEBERAPA SYARAT LAINYA. PERENCANAAN BIAYA DIPENGARUHI OLEH ESKALASI HARGA MATERIAL , UPAH TENAGA KERJA, LOKASI PEKERJAAN SERTA KONDISI PEKERJAAN. STANDARISASI HARGA UNTUK UPAH TENAGA KERJA DAN BAHAN MATERIAL MENGGUNAKAN DATA YANG DIDAPAT DARI DINAS PEKERJAAN UMUM , YAITU ANALISA DAN HARGA MATERIAL SNI 2018 KOTA BALIKPAPAN. DARI HASIL PERENCANAAN ANGGARAN BIAYA YANG ADA MAKA UNTUK RUKO 3 LANTAI UNTUK AHSP DPU KOTA BALIKPAPAN TAHUN 2018 ADALAH SEBESAR RP 6,458,051,000.00 MENGHASILKAN PERENCANAAN PENJADWALAN SELAMA 44 MINGGU ATAU SELAMA 11 BULAN DENGAN MENGGUNAKAN METODE KURVA S.

Keyword : COST ESTIMATION PLAN, SCHEDULIG, KURVA S METHODE

Nilai Properti
: M.ALWI DAHLAN, : 150309267392, : Politeknik Negeri Balikpapan, : TEKNIK SIPIL, : 2018, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Mersianty, S.T., M.T.

E-mail :mersianty@poltekba.ac.id

www.poltekba.ac.id
Drs. Sunarno, M.Eng.

E-mail :sunarno@poltekba.ac.id

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://vclass.unila.ac.id/blog/sdana/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/