Project’s Detail

DESKRIPSI TUGAS AKHIR :
ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN LPA (LAPIS PONDASI AGREGAT) PADA PROYEK JALAN NASIONAL DI KABUPATEN PENAJAM PASIR UTARA
Abstrak (Abstracts)
The national road connected the Penajam Paser Utara district to the Tanah Grogot district has decreased a half of road surfaces that requires repairment, one of which is the job for aggregate layer, the project requires proper planning to use the right heavy equipment, this research is to achieve productivity of the heavy equipment, the cost of rent and oprational expenses of the heavy equipment that will use. This research requires several data field and the paperwork of job project, with the method of completion is productivity calculations heavy equipment, the amount of heavy equipment that needed, rent and operational costs. Aggregate layer work. The result of planning get 1 unit Wheel Loader productivity 987.7 m3/day, 4 unit Dump Truck productivity 332.29 m3/day, 1 unit Motor grader productivity 378.53 m3/day, 1 unit Tandem Roller productivity 261.45 m3/day, 1 unit Water Tank Truck productivity 497.98 m3/day, with a target work time of 1 day, with the total costs of rent heavy equipment and operational obtained about Rp.66.768.705. Jalan nasional yang menghubungkan Kabupaten Penajam Paser Utara menuju Kabupaten Tanah Grogot mengalami penurunan sebagian permukaan jalan maka perlu dilakukan pekerjaan perbaikan salah satunya pekerjaan lapis pondasi agregat, dalam proyek tersebut memerlukan perencanaan penggunaan alat berat dengan tepat, penelitian ini bertujuan untuk mendapatkan produktivitas alat berat, jumlah alat berat, biaya sewa dan biaya oprasional alat berat yang akan digunakan. Penelitian ini membutuhkan beberapa data lapangan dan data administrasi proyek pekerjaan, dengan metode penyelesaian berupa perhitungan produktivitas alat berat, jumlah alat berat yang dibutuhkan, biaya sewa dan biaya oprasional. Pada pekerjaan lapis pondasi agregat, adapun hasil perencanaan didapatkan 1 unit Wheel Loader produktivitas 987.7 m3/hari, 4 unit Dump Truck produktivitas 332.29 m3/hari, 1 unit Motor grader produktivitas 378.53 m3/hari, 1 unit Tandem Roller produktivitas 261.45 m3/hari, 1 unit Water Tank Truck produktivitas 497.98 m3/hari, Dengan target waktu pekerjaan 1 hari, serta total biaya sewa alat dan biaya operasional didapatkan berjumlah Rp.66.768.705

Keyword : Productivity, amount of heavy equipment, rent and operational expenses, aggregate layer

Nilai Properti
: DICKY WAHYU HARDANIPUTRA, : 922016042, : Politeknik Negeri Balikpapan, : TEKNIK SIPIL, : 2019, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Totok Sulistyo, S.T., M.T.

E-mail :totok.sulistyo@poltekba.ac.id

www.poltekba.ac.id
Ezra Hartarto Pongtuluran, S.T., M.Eng.

E-mail :

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://vclass.unila.ac.id/blog/sdana/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/