Project’s Detail

DESKRIPSI TUGAS AKHIR :
RENCANA ANGGARAN BIAYA DAN PENJADWALAN PEMBANGUNAN GEDUNG RUKO 3 LANTAI DI KOTA BALIKPAPAN
Abstrak (Abstracts)
Project to build something like a house of course need to some planing like a coast estimate to avoid overbudget. This planing related with scheduling, and scheduling can help to monitoring progress to avoid this project doesn’t finish to be on time. Curve S method is a one of method use to planning coast of estimate. Some point use to count a coast for project there are: materials, price to pay workers, tools, overhead and profit. The result of using the working unit cost analysis of DPU Kota Balikpapan in 2016 (Permen PU No. 28 / PRT / M / 2016) and the list of wage and material prices in 2017 Balikpapan City, the construction of 3 storey building with 246.5 m² area cost Rp Rp. 1,640,054,194,59 – .. The execution time in the S curve for 8 months 2 weeks or 238 days, with a duration of 1 week equals 7 working days Kegiatan pembangunan proyek tentunya membutuhkan adanya perencanaan yang matang sehingga mempermudah proses jalanya pekerjaaan pembangunan proyek. Perencanaan tersebut meliputi kegiatan perhitungan biaya untuk menghindari adanya pembengkakan biaya juga penjadwalan agar proyek berjalan sesuai jadwal yang telah ditentukan. Metode kurva S merupakan metode yang umum digunakan untuk menghitung rencana anggaran biaya. Adapun hal-hal pokok yang diperlukan untuk menghitung estimasi biaya yaitu: Bahan-bahan, harga upah, peralatan, biaya tak terduga dan keuntungan. Hasil dari menggunakan analisa harga satuan pekerjaan dari DPU Kota Balikpapan Tahun 2016 (Permen PU No. 28/PRT/M/2016) dan daftar harga upah dan bahan tahun 2017 Kota Balikpapan, pembangunan gedung ruko 3 lantai dengan luas 246.5 m² tersebut memerlukan biaya sebesar Rp. 1,640,054,194.59-..Waktu pelaksanaannya dalam kurva S selama 8 bulan 2 minggu atau 238 hari, dengan durasi 1 minggu sama dengan 7 hari kerja.

Keyword : Of estimate, Curve S Methode, Scheduling

Nilai Properti
: ERNA SAIYAH , : 140309241192, : Politeknik Negeri Balikpapan, : TEKNIK SIPIL, : 2017, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Mahfud, S.Pd., M.T.

E-mail :mahfud@poltekba.ac.id

www.poltekba.ac.id
Melviana Firsty, S.T., M.T.

E-mail :melviana.firsty@poltekba.ac.id

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://vclass.unila.ac.id/blog/sdana/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/