Project’s Detail

DESKRIPSI TUGAS AKHIR :
RANCANG BANGUN ALAT BANTU REMOVE AND INSTALL ENGINE PADA UNIT SCANIA R580
Abstrak (Abstracts)
ABSTRACT The importance of the safety factor of unit and vehicle can not be separated from a good maintenance system. In the mining word industry, innovation is always needed to help human work. The aim of this study is to design, create and use aids for the engine release process because in its work there are several risks to occure many accidents. The research methodology used direct research conducted during On Job Training at United Tractors Tbk. site Adaro. The researcher identified the risk of considerable workplace accidents when did remove and install engine Scania R580. Therefore, the researcher took the initiative to design and create a tool that aims to kind a solution for the problems that occured. The results obtained from the design of remove and install engine tools from the calculation analysis using a 12 ton hydraulic jack obtained a leverage of 38.84 kg, in terms work time to 220 minutes faster, the risk accidents reduced, the number playing power from 4 people to 3. Keyword : Designing Build, Safety, Special Tool, Engine, Scania R580 ABSTRAK Semakin disadari sekarang ini pentingnya faktor keamanan dari sebuah unit maupun kendaraan tidak lepas dari sistem perawatan yang baik. Adapun dalam dunia industri pertambangan inovasi selalu dibutuhkan untuk membantu pekerjaan manusia. Penelitian ini bertujuan untuk merancang, membuat dan menggunakan alat bantu untuk proses pelepasan engine karena dalam pekerjaanya memiliki beberapa resiko terjadinya kecelakaan kerja yang cukup besar. Metode yang digunakan adalah penelitian secara langsung yang dilakukan pada saat On Job Training di United Tractors Tbk. site Adaro. Penulis mengidentifikasi adanya resiko kecelakaan kerja yang cukup besar saat melakukan pekerjaan remove and install engine Scania R580. Oleh karena itu penulis berinisiatif merancang dan membuat alat bantu yang bertujuan menjadi solusi dari permasalahan yang terjadi. Hasil yang diperoleh dari rancang bangun alat bantu remove and install engine dari analisa perhitungan menggunakan hidrolik jack 12 ton didapat gaya pengungkit 38,84 kg, segi waktu pekerjaan menjadi lebih cepat 180 menit, resiko kecelakaan berkurang, jumlah main power dari 4 orang menjadi 3. Kata kunci : Rancang Bangun, Safety, Alat Bantu, Engine, Scania R580

Keyword : Rancang Bangun, Safety, Alat Bantu, Engine, Scania R580

Nilai Properti
: ANDI SYAMSUL, : 912016036, : Politeknik Negeri Balikpapan, : ALAT BERAT, : 2019, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Drs. Syaeful Akbar, M.T.

E-mail :syaeful.akbar@poltekba.ac.id

www.poltekba.ac.id
Randis, S.T., M.T.

E-mail :randis@poltekba.ac.id

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://vclass.unila.ac.id/blog/sdana/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/