Project’s Detail

DESKRIPSI TUGAS AKHIR :
PENGUKURAN TOPOGRAFI UNTUK MENGHITUNG VOLUME CUT AND FILL PADA PERENCANAAN PEMBANGUNAN PERUMAHAN DI KM. 10 KOTA BALIKPAPAN
Abstrak (Abstracts)
The plan to move Indonesian State Capital from Jakarta to East Kalimantan has an impact on increasing population growth and community demand to own land and build residential buildings. 2 hectare area (20,000 m2) located at Km. 10 Balikpapan City is planned as a housing development. The area has varied land contours so it requires topographical measurements as a need for land excavation and stockpiling. This research conducted study literature such as data collection, data processing, conclusions and suggestions. The research uses topographic exchange data carried out by the researcher and the team. The volume is calculated using the average cross-sectional method and the square pyramid method. The calculation result, volume using cross-sectional method, cut = 425 m³ and fill = 2850 m³. While the volume using pyramid method, cut = 312.01 m³ and fill = 8689 m³. From the average calculation results of the two methods, it is obtained that the amount of land reserve for ordinary soil types is 368.505 BCM with a stockpile volume of 5769.565 m3. They experience volume changes in loose conditions 460.631 LCM and solid conditions 331.654 CCM. Rencana perpindahan Ibu Kota Negara (IKN) Indonesia dari Provinsi DKI Jakarta ke Provinsi Kalimantan Timur berdampak pada meningkatnya pertambahan penduduk dan permintaan masyarakat untuk memiliki tanah serta mendirikan bangunan rumah tinggal. Tanah seluas 2 hektar (20.000) m² yang berlokasi di Km. 10 Kota Balikpapan direncanakan sebagai pembangunan perumahan. Memiliki kontur tanah yang bervariasi sehingga memerlukan pengukuran topografi sebagai keperluan perencanaan tanah berupa penggalian dan penimbunan. Penelitian ini dilakukan dengan study pustaka yaitu pengumpulan data , pengolahan data , kesimpulan dan saran. Data yang digunakan merupakan data pengukuran topografi yang dilakukan oleh peneliti dan tim, kemudian dihitung volume nya dengan mengunakan Metode Potongan Melintang Rata – Rata dan Metode Piramida Kotak. Hasil perhitungan volume potongan melintang rata – rata galian = 425 m³ dan timbunan = 2850 m³ sedangkan volume piramid kotak galian = 312.01 m³ dan timbunan = 8689.13 m³. Dari rata-rata hasil perhitungan kedua metode diperoleh jumlah cadangan tanah jenis tanah biasa sebesar 368.505 BCM dengan volume timbunan 5769.565 m³ yang mengalami perubahan volume pada kondisi gembur 460.631 LCM dan kondisi padat 331.654 CCM.

Keyword : Topographfi, Volume Cut and Fill

Nilai Properti
: DWI NUR PURWATI, : 922017058, : Politeknik Negeri Balikpapan, : TEKNIK SIPIL, : 2020, : Indonesia, : Tugas Akhir, : Prepustakaan Poltekba,

 

Download Full Text
Pembimbing
Totok Sulistyo, S.T., M.T.

E-mail :totok.sulistyo@poltekba.ac.id

www.poltekba.ac.id
Masrul Huda, M.A.

E-mail :masrul.huda@poltekba.ac.id

www.poltekba.ac.id
https://www.elementbike.id/data/selotgacorku/https://karanganbungacilacap.com/https://vclass.unila.ac.id/blog/sdana/https://sipolahta.dispermadesdukcapil.jatengprov.go.id/fontawesome-free/-/slot186/https://dupak.dinkes.jatimprov.go.id/public/storage/-/https://simawa.upnvj.ac.id/uploads/temp/smaxwin/https://e-learning.uniba-bpn.ac.id/rahasia/https://www.elementbike.id/product/slot186/https://bpiw.pu.go.id/image/scatter/http://lms.sipil.ft.unand.ac.id/layouts/https://e-learning.universitasbumigora.ac.id/local/maxclub/