PROGRAM
STUDI TEKNOLOGI REKAYASA KONSTRUKSI JALAN DAN JEMBATAN |
||||||||
RENCANA
PEMBELAJARAN SEMESTER (RPS) T.A 2022/2023 |
||||||||
MATA KULIAH |
KODE |
BOBOT SKS |
JAM/SMT |
SEMESTER |
TANGGAL PENYUSUNAN |
|||
T |
P |
TOTAL |
||||||
Perencanaan Konstruksi Jembatan |
JJ360317 |
2 |
0 |
2 |
28 |
6 |
21-03-2024 |
|
OTORISASI |
DOSEN PENGEMBANG RPS |
KETUA PROGRAM STUDI |
||||||
Scan QR untuk Akses
Dokumen ini |
|
|
||||||
Ir.. Aco Wahyudi Efendi S.T., M.T., ASEAN Eng., ACPE. |
Mohamad Isram M. Ain S.T., M.Sc. |
|||||||
NIP/NIK. 1117118003 |
NIP/NIK. 198903052022031010 |
|||||||
Capaian Pembelajaran
(CPL) |
CPL
- PRODI |
|||||||
SIKAP |
||||||||
PENGETAHUAN |
||||||||
KETRAMPILAN
UMUM |
|
|||||||
KETERAMPILAN
KHUSUS |
||||||||
Capaian Mata Kuliah
(CP-MK) |
CP
- MK |
|||||||
KEMAMPUAN
AKHIR SETIAP PERTEMUAN (Sub-CPMK) |
||||||||
Deskripsi Mata Kuliah |
Matakuliah Perencanaan Konstruksi Jembatan mempelajari | |||||||
Materi Pembelajaran/
Pokok Bahasan |
|
|||||||
Pustaka |
Pustaka Utama: |
|||||||
Media Pembelajaran |
Media : |
|||||||
Dosen Pengampu |
Aco Wahyudi Efendi, |
Mata Kuliah |
Perencanaan Konstruksi Jembatan |
|||
Kode Mata Kuliah |
JJ360317 |
Minggu ke- |
Sub
CP-MK (sebagai kemampuan
akhir yang diharapkan) |
Indikator |
Kriteria & Bentuk
Penilaian |
Metode Pembelajaran
(Estimasi Waktu) |
Materi Pembelajaran
(Pustaka) |
Bobot Penilaian
(%) |
|||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|||
1 | 1. Mampu memahami apa yang dimaksud prategang. [C1, C2, C5, P2, A1, A2, A3] |
Mahasiswa mampu menjelaskan tentang gambaran umum prategang |
Kriteria: kesesuaian
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60”
|
Prokes dan K3 Pemahaman umum. 1. Prestressed Concrete, Edward G Nawy |
2 |
|||
2 | 2. Mampu mengenal konsep balok prategang termasuk komponenkomponennya. [C1, C2, C5, P2, A1, A2, A3] |
Mahasiswa mampu menjelaskan tentang gambaran umum prategang |
Kriteria:
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60” |
Konsep dasar. Material dan sistemprategang. 1. Prestressed Concrete, Edward G Nawy |
2 |
|||
3 | 3. Mampu merancang balok prategang akibat lentur pada statis tertentu termasuk end blok. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu menerepkan kesesuaian tahapan perhitungan |
Kriteria: Kesesuaian dan sistematika
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 5x(2x50”) TT: 5x60” BM: 5x60” |
Perencanaan balok akibat lentur dengan cara elastis dan ultimate (gaya prategang efektif diasumsikan). Pustaaaka Utama: E.G.Nawy, 2003, Prestressed Concrete, A Fundamental Approach, 4th Ed., Prentice Hall, Eng.Cliffs NJ. Nilson, A.H. et al., 2010, Design of Concrete Structures, 14th, Mc. Graw-Hill, N.Y. A.E. Naaman, 2004, Prestressed Concrete Analysis and Design, Fundamentals, 2nd.Ed., Techno Press 3000, Michigan 48105. Andri Budiadi, 2008,Desain Praktis Beton Prategang, Andi Offset, Yogyakarta BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
4 | 4. Mampu merancang balok prategang akibat lentur pada statis tertentu termasuk end blok. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu menerepkan kesesuaian tahapan perhitungan |
Kriteria: Kesesuaian dan sistematika
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif)
TM: 5x(2x50”) TT: 5x60” BM: 5x60” |
Perencanaan balok akibat lentur dengan cara elastis dan ultimate (gaya prategang efektif diasumsikan). Pustaaaka Utama: E.G.Nawy, 2003, Prestressed Concrete, A Fundamental Approach, 4th Ed., Prentice Hall, Eng.Cliffs NJ. Nilson, A.H. et al., 2010, Design of Concrete Structures, 14th, Mc. Graw-Hill, N.Y. A.E. Naaman, 2004, Prestressed Concrete Analysis and Design, Fundamentals, 2nd.Ed., Techno Press 3000, Michigan 48105. Andri Budiadi, 2008,Desain Praktis Beton Prategang, Andi Offset, Yogyakarta BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
5 | 5. Mampu merancang balok prategang akibat lentur pada statis tertentu termasuk end blok. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu menerepkan kesesuaian tahapan perhitungan |
Kriteria: Kesesuaian dan sistematika
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif)
TM: 5x(2x50”) TT: 5x60” BM: 5x60” |
Perencanaan balok akibat lentur dengan cara elastis dan ultimate (gaya prategang efektif diasumsikan). Pustaaaka Utama: E.G.Nawy, 2003, Prestressed Concrete, A Fundamental Approach, 4th Ed., Prentice Hall, Eng.Cliffs NJ. Nilson, A.H. et al., 2010, Design of Concrete Structures, 14th, Mc. Graw-Hill, N.Y. A.E. Naaman, 2004, Prestressed Concrete Analysis and Design, Fundamentals, 2nd.Ed., Techno Press 3000, Michigan 48105. Andri Budiadi, 2008,Desain Praktis Beton Prategang, Andi Offset, Yogyakarta BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
6 | 6. Mampu merancang balok prategang akibat lentur pada statis tertentu termasuk end blok. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu menerepkan kesesuaian tahapan perhitungan |
Kriteria: Kesesuaian dan sistematika
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif)
TM: 5x(2x50”) TT: 5x60” BM: 5x60” |
Perencanaan balok akibat lentur dengan cara elastis dan ultimate (gaya prategang efektif diasumsikan). Pustaaaka Utama: E.G.Nawy, 2003, Prestressed Concrete, A Fundamental Approach, 4th Ed., Prentice Hall, Eng.Cliffs NJ. Nilson, A.H. et al., 2010, Design of Concrete Structures, 14th, Mc. Graw-Hill, N.Y. A.E. Naaman, 2004, Prestressed Concrete Analysis and Design, Fundamentals, 2nd.Ed., Techno Press 3000, Michigan 48105. Andri Budiadi, 2008,Desain Praktis Beton Prategang, Andi Offset, Yogyakarta BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary 3 |
3 |
|||
7 | 7. Mampu merancang balok prategang akibat lentur pada statis tertentu termasuk end blok. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu menerepkan kesesuaian tahapan perhitungan |
Kriteria: Kesesuaian dan sistematika
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif)
TM: 5x(2x50”) TT: 5x60” BM: 5x60” |
Perencanaan balok akibat lentur dengan cara elastis dan ultimate (gaya prategang efektif diasumsikan). Pustaaaka Utama: E.G.Nawy, 2003, Prestressed Concrete, A Fundamental Approach, 4th Ed., Prentice Hall, Eng.Cliffs NJ. Nilson, A.H. et al., 2010, Design of Concrete Structures, 14th, Mc. Graw-Hill, N.Y. A.E. Naaman, 2004, Prestressed Concrete Analysis and Design, Fundamentals, 2nd.Ed., Techno Press 3000, Michigan 48105. Andri Budiadi, 2008,Desain Praktis Beton Prategang, Andi Offset, Yogyakarta BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
8 | UTS |
UTS : Ujian Tengah Semeter |
30 |
||||||
9 | 9. Mampu menghitung Kehilangan Gaya Prategang. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu memahami peraturan dan sistematis penyusunan laporan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi |
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60” |
Prestress Losses jangka pendek dan jangka panjang. BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
10 | 10. Mampu merancang akibat geser dan torsi pada balok prategang. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu memahami peraturan dan sistematis penyusunan laporan perhitungan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi dan dokumen tugas |
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60” |
Perencanaan geser dan torsi BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
11 | 11. Mampu merancang balok prategang pada statis tak tentu. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu dan memahami peraturan dan sistematis penyusunan laporan perhitungan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi dan dokumen tugas
|
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60 |
Perencanaan balok statis tak tentu BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
12 | 12. Mampu merancang balok prategang pada statis tak tentu. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu dan memahami peraturan dan sistematis penyusunan laporan perhitungan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi dan dokumen tugas |
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60 |
Perencanaan balok statis tak tentu BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
13 | 13. Mampu menghitung kemampuan layan balok prategang. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu dan memahami peraturan dan sistematis penyusunan laporan perhitungan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi dan dokumen tugas |
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60 |
Perhitungan lawan lendut, lendutan dan lebar retak BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
14 | 14. Mampu merencanakan balok prategang tahan gempa. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu dan memahami peraturan dan sistematis penyusunan laporan perhitungan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi dan dokumen tugas |
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60 |
Perencanaan balok prategang tahan gempa BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
15 | 15. Mampu merencanakan balok prategang tahan gempa. [C1, C2, C3, C4, C5, C6, P2, A1, A2, A3, A4, A5] |
Mahasiswa mampu dan memahami peraturan dan sistematis penyusunan laporan perhitungan |
Kriteria: kesesuaian dan sistematika Bentuk nontest: Presentasi dan dokumen tugas |
Ceramah, Praktik, Diskusi (Interaktif, SCL, kontektual, scientific, integratif) TM: 2x50” TT: 60” BM: 60 |
Perencanaan balok prategang tahan gempa BSN, 2013, SNI 2847:2013 – Persyaratan Beton Struktural untuk Bangunan Gedung, Jakarta. ACI, 2011, ACI 318M-11 – Building Code Requirements for Structural Concrete, Farmington Hills. Elliot, K.S., 2002, Precast Concrete Structures, Butterworth Heinemann Publication. Elliot K.S. and Tovey, a.K., 1996, Precast Concrete Frame Building, Design Guide, British Cement Association, BCA’s Publisher PCI, Precast/Prestressed Concrete Institute, 1985, PCI Design Handbook, third edition, Chicago, Illinois. ACI T1.1-01, 1999, Acceptance Criteria for Moment Frames based on Structural Testing and Commentary |
3 |
|||
16 | UAS |
UAS : Ujian Akhir Semester |
30 |
||||||